Plated Piping (T-Junction)

A three-way split in plated piping. Splitting a run does not double what it carries: both branches still share the one pool and the one pressure of the whole network.

See Pipe networks and pressure.

Plated Piping (T-Junction), isometric
Plated Piping (T-Junction), the front (east)frontPlated Piping (T-Junction), the right (north)rightPlated Piping (T-Junction), the back (west)backPlated Piping (T-Junction), the left (south)leftPlated Piping (T-Junction), the top (up)top
Plated Piping (T-Junction), drawn from the front, which faces east.

Made by

Plated Piping (T-Junction), with nails and strips
any Hammer (tool, not consumed)
Nails and strips (Iron or Steel)Plate (Iron or Steel)Nails and strips (Iron or Steel)
Nails and strips (Iron or Steel)
Plated Piping (T-Junction)

Needs: 1 Plate (Iron or Steel), 3 Nails and strips (Iron or Steel), a Hammer (kept); makes 1 Plated Piping (T-Junction)

Plated Piping (T-Junction), with rivets
any Hammer (tool, not consumed)
RivetsPlate (Iron or Steel)Rivets
Rivets
Plated Piping (T-Junction)

Needs: 1 Plate (Iron or Steel), 3 Rivets, a Hammer (kept); makes 1 Plated Piping (T-Junction)

Amounts are the mod's defaults; the recipe-cost level changes them (see recipe cost levels).